• previous

    back to index
    next
    Fu Quan

    Electrical Electrical Team Blog Electrical

    1/19 Martin Luther King Day

    posted Jan 19, 2009 10:59 PM
        Today, We were working on our Advance Framework. Ms kim went over each VI's useage and the contorl of the robot with us. After that, We puted our fake shifting program into the Advance Project. The different of using Advance Robot Project and Basic Robot Project is Advance project gives more contorls to the Robot. And sperate the Basic Project into different parts. So like if we want to open up a motor, we put the open motor insaid the Begin VI. And close the motor in the Finish VI. 
     <--working so hard. ^^
     
        Meanwhile, Ms owens is intorducing this year's  new control system to our new team mate Jessica.
        After setting up the control system board to our new chassy. We started testing on the speed of the robot by using the fake shifting. The full speed of the robot is a little bit faster than the slow speed, which is 85%of the full speed. But, when then Robot turned. Slow speed take a very good advantage.
        And also, we practicing throwing the trailer ball too.
     
     

    Disclaimer: These are actual student posts done by students and not paid actors. We make no claims or guarantees that the information contained herewith is 100% accurate or free of grammatical/spelling errors (English is not the first language for many of our members). You have been warned.

    2000-2009 © President William McKinley High School Robotics